Temporary Roof Systems

Temporary Roof Systems

Work in Any Weather, Any Season

Our temporary roof systems provide fully weatherproof protection for properties undergoing roof work, structural repairs, or full reroofing. They allow your contractors to work safely and continuously regardless of British weather conditions.

Constructed from aluminium lattice beams and high-tensile sheeting, our temporary roofs are robust, quick to install, and designed to withstand wind, rain, and snow — protecting both the property and the workforce beneath.

Fully waterproof coverage
Aluminium lattice structure
Available in multiple spans
Minimal disruption to occupants
Structural engineering sign-off
Rapid installation & removal
Get a Free Quote

Key Benefits

All-Weather Protection

Enables continuous working through rain, wind, and cold — no more weather-related delays costing you money.

Property Protection

Shields the interior from water ingress during roof strip and replacement — protecting furniture, ceilings, and structure.

Worker Safety

Provides a covered, safe working environment that reduces exposure-related risks for operatives.

Programme Certainty

Eliminates weather-induced delays, keeping your project on programme and reducing cost overruns.

Occupied Buildings

Allows roof work to be carried out on occupied residential and commercial buildings without decanting occupants.

Security & Deterrent

A fully sheeted temporary roof also deters vandalism and theft of materials stored below.

Installation Process

01
Site Survey

We visit the property to assess roof size, pitch, structure, and any access restrictions.

02
Design & Engineering

Our temporary roof is designed by a qualified structural engineer, with full load calculations provided.

03
RAMS & Sign-Off

Method statement and risk assessment submitted, along with structural engineer sign-off documentation.

04
Scaffold Erection

The base scaffold is erected around the building to support the temporary roof structure above.

05
Roof Installation

Aluminium lattice beams are lifted into position and fully weatherproof sheeting is fixed across the span.

06
Handover

We walk through the completed system with the site manager and roofing contractor before work begins.